600字范文,内容丰富有趣,生活中的好帮手!
600字范文 > 地下开挖 underground excavation英语短句 例句大全

地下开挖 underground excavation英语短句 例句大全

时间:2019-08-23 21:46:06

相关推荐

地下开挖 underground excavation英语短句 例句大全

地下开挖,underground excavation

1)underground excavation地下开挖

1.The mathematical models based on fuzzy mathematics and grey system theory were applied to the prediction of the natural slope failure due tounderground excavation under complex topography in mountain areas.针对复杂地形条件下工程开挖的实际情况,利用Fuzzy数学和灰色系统理论建立了预测山区地下开挖引起岩体及自然边坡失稳的数学模型,并对具体矿山工程中岩体移动和自然边坡失稳问题进行了计算和分析。

2.Large displacements of slope and surface deformation due tounderground excavation are discussed using the DDA model with results compared with those from DEM.基于 DDA计算模型 ,补充和发展了 DDA计算程序 ,分析了边坡大位移问题和地下开挖引起地面变形的工程实例 ,并与离散元计算结果进行了比较研究。

3.In order to ensure normal use of the near buildings under the influence ofunderground excavation,we need an accurate assessment on the influence of the underground excavating on the adjacent buildings damage.为了保证地下开挖影响下建筑物的正常使用,需要准确评价地下开挖工程对临近建筑物损害影响的程度。

英文短句/例句

1.Analysis Underground Opening Based on D-InSAR;基于D-InSAR技术的地下开挖空间分析

2.Construction technical code for underground excavating engineering of hydraulic structures水工建筑物地下开挖工程施工技术规范

3.They began to mine under the castle.他们开始在城堡下挖地道。

4.Safety management for excavation of underground chambers and tunnels of Baise multipurpose dam project百色水利枢纽地下洞室开挖安全管理

5.Discussion on New Tunnel Excavation Method Used in Soft Ground软弱地质条件下隧道开挖新方法探讨

6.Numerical Simulation for Excavation of Underground Caverns Under High Geostress Conditions高地应力下地下洞室群开挖过程的数值模拟

7.Manual Excavated Continuous Concrete Wall of the Arch Bridge Abutment Foundation in the Loess Region黄土地区拱桥桥台人工开挖地下连续墙基础

8.Blasting Excavation Experiment of Cliff Rock-bolt Beam in Underground Power House of Guandi Hydropower Station官地地下厂房岩锚梁岩台开挖爆破试验

9.The Application of Diaphragm Wall of a Excavation Nearby Existing MTR地下连续墙在邻近地铁的基坑开挖中的应用

10.ANALYSIS ON DEFORMATION OF CONTINUOUS CONCRETE WALL IN COMPLETE CONSTRUCTION PROCESS近邻地铁地下连续墙全过程开挖变形分析

11.Settlement Monitoring Analysis for a Road During the Underground Tunnel Excavation地下隧道开挖引起某公路地表沉降监测分析

12.Displacement and Distortion of Earth Surface Caused by Excavation of Urban Underground Works城市地下工程开挖导致的地表移动及变形研究

13.Analysis of Earth Pressure and Displacement of Wall of Continuous Concrete Wall of Unloading Pit in Some Harbour基坑开挖过程中地下连续墙位移与土压力分析

14.Excavation technology of three large chambers at Longtan Hydropower Station龙滩水电站地下三大洞室开挖技术浅析

15.Construction technique for excavation and support of chambers and tunnels under unfavorable geological condition不良地质条件下的洞室开挖及支护施工技术

16.The Testing Study on Urban Underground Space Opens to Excavate to Environment;城市地下空间开挖对环境的影响与试验研究

17.Study of Influence to the Vertical Displacement of Tunnel at the Bottom of Excavation in Port Land;陆域基坑开挖对地下管道竖向位移影响研究

18.Deformation Analysis of Tunnels Due to Adjacent Underground Excavation;地下工程开挖对临近隧道变形的影响分析

相关短句/例句

underground digging地下开挖

1.Based on theunderground digging problem of city building and the mining production, the character and the law of surface deformation caused byunderground digging are studied the damage of buildings caused by surface deformation is analyzed the height influence on the building s resistant ability is studied.针对城市建设和矿山生产的地下开挖问题 ,研究了地下开挖引起地表变形的特征和规律 ,探讨了地表变形对地面建筑物的损害 ,分析了建筑物高度对建筑物抗变形能力的影响 。

3)tunnel and underground excavation洞挖及地下开挖

4)underground openings地下工程开挖

1.Three dimensional visualizatization for stratified geological objects andunderground openings;层状地质体与地下工程开挖三维可视化

5)excavation of underground chambers and tunnels地下洞室开挖

1.Safety management forexcavation of underground chambers and tunnels of Baise multipurpose dam project;百色水利枢纽地下洞室开挖安全管理

6)excavating of subterranean structure地下结构开挖

延伸阅读

地下厂房开挖为建造位于地下的厂房,将土和岩石松动、破碎、挖掘和运输出渣的工程。地下厂房一般断面较大,在开挖过程中,保持顶拱安全和高边墙稳定的问题十分重要,施工中要根据具体条件采用相应的施工方法。主要的方法是:①钻孔爆破法。一般先开挖顶拱和进行顶拱支护、衬砌,然后再进行下部分层分台阶的开挖。开挖后立即进行锚喷。如日本今市抽水畜能电站的地下厂房,宽33.5m、高51m、长160m,首先在顶部开挖宽8m、高7.5m的中心导洞,全长挖完后,再扩挖加宽到22m,然后用阶梯式,逐渐加深加宽洞室的主体部位(见图)。②光面爆破和预裂爆破技术。③锚喷支护。对高边墙则采用预应力锚索、锚杆和喷射混凝土相结合的结构,并可作为永久支护。④将新奥法(见隧洞开挖)的原则应用于大断面地下厂房的开挖。如德国瓦尔德克二级抽水蓄能电站的地下厂房,宽33.5m、高54m、长106m,地质条件较差,按新奥法的原则施工,取得良好结果。⑤采用汽车和带式输送机运输。地下厂房与各项联通的洞室群错综复杂,需综合考虑厂房本身及其他洞室的交通运输方式,合理选择出渣方式。一般采用汽车或带式输送机,以汽车运输方式居多。还可利用竖井,从底部的作业洞出渣。⑥预留支撑岩柱。在地质条件差,开挖跨度大的情况下,可采用在中间预留岩柱,最后挖除的办法。如中国龙羊峡水电站厂房安装间在地下,最大开挖跨度38.2m、高38m、洞长47m。由于围岩受断层切割,地质条件复杂,施工中利用预留岩柱支撑,分段开挖,分段衬砌,终于安全建成。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。